In an increasingly automated world, the constr
uction industry has stayed relatively manual. Machines simply can’t replicate the level of precision and technique required to install building systems; however, Egan Company’s U.L. 508A Panel Shop has found one way to use automation to its advantage.
Precision, speed, and safety are the cornerstones of any successful shop. Whether for an in-house job or a customer, the goal is to deliver a product quickly and correctly – the first time. And that’s why our panel shop implemented the Steinhauer ModCenter, an automated modification tool that provides fast, clean cut holes in each control panel.
Shop professionals previously measured, drew, and cut enclosures by hand – taking up to four hours per panel. Although this is a time honored way of providing a quality panel, it is not efficient and leaves room for human error or injury.
By allowing for multiple clean cut outs and back panel drilling/tapping tasks to be completed all at once, the machine improves the overall quality of each control panel.
Egan’s Panel Shop wiremen program the Steinhauer ModCenter to cut each panel per customer specifications. By eliminating the need for wiremen to manually measure, drill, tap, and process, the time for each panel is reduced to about 30 minutes – 87.5% less than if done manually.
This machine frees up a lot of time for our wiremen to work on other aspects of our projects, and get panels out the door much quicker. We estimate it does the work of nearly two people.
-Tim Blair, Egan Panel Shop Manager
Once specifications are programmed, it can be saved as a template for future use – making repeat orders or modification of standard equipment even faster. Delays and waste are greatly reduced, and shop personnel are less likely to be injured during the drilling and milling process.

Watch the Steinhauer in Action: bit.ly/EganSteinhauer
“This tool enhances Egan’s already excellent safety program, by reducing the risk associated with cutting and drilling into a panel with power tools,” said Jeff Hawthorne, Egan Company Senior Vice President. “We appreciate the efficiency of this machine, but we appreciate the increased safety it provides the shop even more.”
With this great new addition to the panel shop, Egan is now able to be more responsive to customer’s needs and produce more consistent products with a promotion of greater safety.


As the popularity of smart building technology increases, Egan Company continually strives to provide customers new and innovative ways to implement this technology in their facilities. Due to this commitment to innovation, Egan was chosen as a
The OnGuard line of products is a natural fit for Egan and its
The success of any job is dependent on finding the right team. With our collaborative mechanical, electrical, and systems approach, we have positioned ourselves to be the best possible partner for any construction project.
Early detection with a fire alarm system is the key to protecting people and property. But it’s hard to tell if they are fully operational just by looking at them – that’s why it pays to schedule Egan annually for fire alarm inspections.
The inspection will not only determine if a property is code-compliant, but also provide feedback on potential areas to upgrade. And buildings are even protected outside of an annual inspection with our 24/7 emergency support.
When it comes to Egan Company’s new Champlin facility, collaboration is the name of the game. With the consolidation of four metro offices into two – the new Champlin location and corporate office/shops in Brooklyn Park – more Egan employees are now able to work together under one roof. The result is improved production and work-flow; and the benefits are seen no better than in the renovation process itself, during which Egan was able to experience its own capabilities first-hand. The renovations began soon after the purchase of the building, starting in September 2015. By the end of the project, Egan had completed 75 to 80 percent of the retrofit in-house.
The decision to buy the manufacturing plant was made not only to meet growing needs, but also in order to provide customers with a more seamless delivery and overall experience, starting with Egan’s Tom Buirge – the construction manager who was appointed the ‘single point’ on behalf of all trades on the renovation project. Having an Egan project leader coordinating all trades helped ensure deadlines were enforced, but also created flexibility with timelines.