Prefabrication Proves Priceless

February 10, 2017

After a recent renovation and expansion, Park Nicollet’s Prairie Center Clinic is now running on a more efficient electrical system. Egan electrician’s converted the existing 208 volt service to 800 ampere, 277/480 volt, 3PH/4W service. In order to maintain daily operations, utility power shut down service was completed during clinic off hours.

The equipment needed to be small enough to move through the existing building corridors and doorways, and then fit into the limited space of the existing service location. To reduce shutdown time, Egan designed, fabricated, and assembled a service panel, feeders, and transformer mounting frame assembly to fit the building’s restricted space requirements.

This utilization of prefabricated components provided added cost savings for the customer and resulted in a reduced project timeline.